A completion-rate target alone wouldn't prove a redesign had actually taken hold.
This is a Product Strategy Metrics Deterioration problem.
Follow-on measurement framework delivered to NoMoBo. All figures are modeled, not measured. Builds on the Phase 1 field-assessment redesign, a built, interactive prototype delivered to NoMoBo that was never deployed into production or usability tested.
Phase 1 was designed to raise completion rates, but hitting that target wouldn't by itself prove the feature people needed most — offline mode — was actually being used, or that the improvement would last. I designed and delivered an activation-funnel and 90-day-retention measurement framework to find out — modeling a 4× activation lift and 3.8× retention lift, not a measured result.
WhoProduct & UX leadership from Phase 1Would need proof beyond a single targeted completion-rate number, even before anything is built.
WhatProve field access became sustained field usageTrack adoption and retention over weeks, not just measure day-one completion.